Garda Lake Project

By the end of the month of November 2018 Drafinsub Air Diving, ROV and Survey Teams converged to Toscolano Maderno to begin the inspections of the two pipelines that crosses the biggest lake in Italy. Those operations are propedeutical to the deep diving activities that will be carried out in […]

Refloating of Mediterraneo dry dock in Livorno completed

Drafinsub has successfully concluded the operations for the refloating of the “Mediterraneo floating dry-dock” in Livorno. After 2 months of intense work, and more than 500hours of diving for the set-up of the refloating plant designed by Stige, under the supervision of Ing. Alessio Gnecco, the Mediterraneo has been taken […]