Tornano i sub di Drafinsub-Underwater Technology, per restaurare le condotte sublacuali

Tornano i sub di Drafinsub-Underwater Technology, per restaurare le condotte sublacuali. Ad un anno dalla precedente ispezione, dal 9 Marzo al via l’allestimento del pontone che servirà da base a Drafinsub. Due motonavi, una camera iperbarica d’emergenza, un veicolo filoguidato ROV Falcon e un impianto di saturazione per operazioni in […]

New IMCA Diver Medic training

New IMCA Diver Medic training. The course it’s organized by Tritons Centre, in La Spezia, Italy. The centre will train commercial divers as Diver Medic. Read more on:

Lavori subacquei Lago di Garda. Drafinsub – Underwater Technology.

Lavori subacquei lago di Garda. Acque Bresciane ha incaricato nuovamente Drafinsub – Underwater Technology, per eseguire la manutenzione di alcune tubazioni sublacuali. La ditta infatti, si occuperà di eseguire il monitoraggio delle linee e qualche riparazione. Inoltre eseguirà la messa in sicurezza della condotta che è lunga circa 6800 m. […]

Garda Lake Project

In February 20th Saturation diving operations started in Garda Lake. Pontoon Umberto I is fully mobilized with SAT System Raffaella, Air Diving Spread, 3 electric generators, mooring winches  and 12’000 cubic meters of Heliox. Scope of work is the rehabilitation of the two pipelines which cross the lake from Torri […]

Drafinsub has concluded the operations at Mosul Dam

After nine months of hard work in Mosul Dam Area, Drafinsub is proud to announce the successfully conclusion of the operations to the bottom outlet of the dam. It has been a wonderful journey and a precious opportunity of growth to take part in such a international and complex project. […]

Refloating of Mediterraneo dry dock in Livorno completed

Drafinsub has successfully concluded the operations for the refloating of the “Mediterraneo floating dry-dock” in Livorno. After 2 months of intense work, and more than 500hours of diving for the set-up of the refloating plant designed by Stige, under the supervision of Ing. Alessio Gnecco, the Mediterraneo has been taken […]

Mosul Dam Project

Drafisub has joined the Mosul Dam Project, Iraq, with the Raffaella Sat System. We will be involved in the “Rehabilitation of Bottom Outlet” phase, to cooperate with the SELI team. Since May 2016, Trevi is leading the Italian experts team which is working to stabilize the foundations of the Mosul […]