Drafinsub goes to Egypt

Our Saturation System named Raffaella is leaving to Egypt to be assembled and positioned on the Edt Ares, the work has as purpose the construction of ten spools at the depth of ninety meters, to connect ten new gas extraction wells within the Petrobel reservoir at 45 miles from Port Said. The successful solution of Drafinsub portable system is to have built a system that has the same dimension of few containers, therefore easy to be transported and assembled on board with, consequently, lower costs than usual.