Daily Archives: 08/10/2013

1 post

Drafinsub goes to Egypt

Our Saturation System named Raffaella is leaving to Egypt to be assembled and positioned on the Edt Ares, the work has as purpose the construction of ten spools at the depth of ninety meters, to connect ten new gas extraction wells within the Petrobel reservoir at 45 miles from Port […]